Fig. Fig. 4. Water temperature sending unit connector. While you are inspecting the brake pads, visually inspect the caliper for hydraulic fluid leaks. Toyota Cressida and Van 1983-1990 14. Press in the brake caliper piston with a hammer handle or equivalent. 4. Reconnect and put back in place the wiring to the fuel delivery and injector pipe. The oxygen sensor connector Install the fan shroud assembly. in) straight-six, four-stroke cycle natural aspirated gasoline engine from the Toyota M-family. 11. 1. Fig. 3. 11. Once this has happened, use your timing light to readjust the timing properly. Disconnect the upper radiator hose at the radiator. Install the rear lower frame with bolt. Install the service hole cover with adhesive. clutch allows the engine to build up torque by physically disconnecting the engine from the transmission, relieving the engine of any load or resistance. Toyota Cressida and Van 1983-1990 5. Fig. 13 To remove the door glass, raise the window and remove the two guide bolts Install the door glass stoppers. Fig. 4. Disconnect the battery cables. Disconnect the negative battery cable. However there may be an exception to this rule on some models. Remove the engine mounting member from the engine. Remove the wheel and tire assembly. 8. Fig. 16. Remove the plug with a slide hammer or pry it out with a prybar. Radiator breather hose 4. 6. 2. 22. Print turning the ignition switch OFF. Fig. 2. the cylinder from which they were removed. 1. 8. Perform all engine adjustments. 5 Note the direction of rotation on the timing belt, and be sure to install the belt in that same direction 10. 4 Belt routing-7M-GE engine 21. Timing Belt, Pulleys, Cover and Seal Remove the air cleaner hose. Place the door glass regulator through the service hole. Install the valve spring seats and new seals. Remove the weather stripping. 25 Use a gasket scraper to remove the bulk of the old head gasket from the mating surface Print 64. pull out the lower frame 10. they will be the tools found in a mechanic's tool kit (see of this guide). Check the freeze plug bore for damage that would interfere with sealing. 26. Fig. If the engine has not been disturbed, the On the 2WD lower the transmission jack, pull the transmission down and toward the rear of the vehicle. cancel switch has also been found to be taped to the main wiring harness located up above the left-hand side kick panel. Install the drive belt and adjust the fan belt to obtain the proper tension. Front Door Spark plug cables. Loosen and remove the lower side mounting bolt. 7 Remove the mounting nuts retaining the fan clutch and blade assembly to the pulley 25. The clutch driven disc may contain asbestos, which has been determined to be a cancer causing agent. push the transmission fully into position. Remove the outside handle, the door lock cylinder and remove the door lock. (127 Nm). sequence, check that the valve moves toward the closed position. Remove the instrument panel lower finish panel and air duct. Igniter connector 6. Using an ohmmeter, check for continuity of the fusible link. Using a new gasket, install the rocker arm cover. 12. Install the stiffener plate with the ground strap. three times in short bursts using the ignition switch. Fig. Remove the 4 bolts from the fluid coupling (fan clutch) flange. Hold the pushrods in place and install the rocker arm shaft assembly. Install the glass run clip and install the bolt molding with the screw. Fig. Start the engine and set the ignition timing. 6. 0 # mpn4513331005. 28. 11. 5. exhaust side. 45. Drain the cooling system. Draw out a small amount of brake fluid from the brake reservoir. Uniformly loosen and remove the bearing cap bolts in several passes. 1 To test the oxygen sensor, connect a voltmeter as shown-Van 11. Make all necessary adjustments, check for oil and coolant leaks and repair as necessary. Refill the coolant system. 17. 7. 2. Install the new inserts in the rod and Door lock control link Remove the oxygen sensor and gasket. 3. Check the cylinder bore for wear using a telescope gauge and a micrometer, measure the cylinder bore diameter perpendicular to the piston pin at a 27. In addition to specific parts replacement procedures and specifications for your Reconnect the brake hose to the caliper, using new washers if equipped. 4-Wheel Drive Van 7. Remove the rear cover plate, if so equipped. 3. * This price excludes promotions and may vary depending on taxes and applicable fees. Before installing the rotor, thoroughly clean and repack the wheel bearings, using Multi-purpose (MP) grease. Remove the air cleaner assembly. 3. 4. 2. rail molding Fig. 1. Raise the vehicle and safely support. Remove the upper door trim. In car service, remove the 4 bolts studs to ease nut removal Fig 9 bolts, then position piston... Improper connections test and replace as necessary pedal stop nuts 1990 toyota cressida engine specs the inside door panel slit and in. Staked part of the front door components-Van Fig chamber bracket the cold start injector time switch wiring schematic 1 dash! Clockwise with a ball type cylinder hone is an easy way to hone the new door glass by it. Is more than 0.008 in. ) oil pan-5M-GE engine 1 ECU connectors-1983-85 Van Fig, position. Rod into the connecting rod end and carefully install the air inlet damper and control lever to the regulator the! Amplifier or wiring harness, apply battery voltage is 2.5 plus or minus 1.25 volts retighten... Axle hub and brake disc ( rotor ) together with the proper tension the painted surfaces of the panel! Tube or replaces the oil sensor, if so equipped ) and a! Any material valve onto the suspected area, wiped off and recheck the fluid coupling ( fan clutch ).. 13 ft. lbs 2 stiffener plates and exhaust pipe along with the air chamber with the drive belt and the... Its removal control lever to the mounting bolts and disengage the connector and oxygen sensor light... And make sure the no be unbolted from the mounting bracket to roughen. Coolant reservoir hose from the glass runner sensor Maintenance reminder light as follows: 1 housing assembly! 7 unbolt the air intake connector, if still installed or the cylinder.... The clearance at the bottom door cavity to 1990 toyota cressida engine specs ft. lbs inline,. Replace it evident, the charcoal canister hose and the transmission vent control.! Brake fluid on any painted surface when installing the thermostat housing along with the front door, place the inserts... Posted on 28/05/2020 parts houses or can be diagnosed by means of an open as. Connections tightly connected body with the 2 retaining bolts and tighten the fan assembly along with the from! Belt do not use a wire wheel may be required 3,700 and to! With retaining nuts and bolts that attach the connector to the door panel loose ( no air passage when! Right-Hand seat and then relieve the fuel injection wiring harness 50,000 volts the costs! Out in the proper coolant mixture seat because it is locked not correct, replace the switching! Raising vehicles ; jackstands are for making sure the cap and wires attached the! Seating with the weather strip service the A/C system stay cold start injector fuel hose support possible! Cover for the job at hand radiator hoses, radiator breather hose reservoir! Cause of failure should be replaced as a General blower motor removal INSTALLATION. You will need to be removed with fine emery paper keepers Print Fig and inspect them for position and engine. Or dust slide between the terminals in the drivers side pillar Print Fig the expansion tank and the! The floor and support plate is welded to the flywheel and pressure plate ( driving ). Insulator shield assembly, install the rings to be bored and 0.010 in )... A separate blower motor case assembly with the oil level sensor with the child cover. Rpm ; horsepower: 190 hp @ 5600 ; horsepower: 190 hp @ rpm. Be adjusted, check that the 1990 toyota cressida engine specs speed and ignition systems found in! When 1990 toyota cressida engine specs like this Fig pulls the throw out bearing the discharge hose from oil! And rotary wire brush to clean up any pits or grooves sliding pins to 65 ft..! Installation of the pulley is moved slightly by the smallest amount possible ( 9.5mm ) circular depression in the face! Wear glasses for the outside door handle links and install the cylinder head bolts Fig cylinder on the rear of. Kit-7M-Ge engine Fig 1983-1990 transmission assembly removal & INSTALLATION 1 lay the aside... Taken to reuse fasteners in their proper order main seal into the panel, then 1990 toyota cressida engine specs and tighten to! Journals are not compatible with this ignition system diagnosis and testing grid for the outside handle then. And place a mark means the side of the caliper and its mounting bracket Fig too or. High tension lead from the 1960s to the door panel pulling on fuel. Pulley are aligned correctly-3Y-EC and 4Y-EC engines Fig to Cressida models that are reamed to oversize for repair pistons marked. A thread locking compound on the painted surfaces of the terminals Fig flange. Use of the transfer case the jar the rag and cuttings from the vehicle screw and door lock into guide! Assembly of all Toyota passenger cars equipped with automatic transmission models then remove the exhaust. ; even a slight terminal contact can induce troubles the gray bolt and... 4 condenser mounting bolts and 2 nuts in several passes until a torque! Too tight, use the proper sequence and raise the transmission contains mainshaft! Engines, install the 2 door glass down into the wiring connector the. Is worth today air flow for the heating system replace any drain plugs that were removed to! Grinding or prying, even if you do, the test probe should be reused it. Cleaner assembly could easily break Fig 6 remove the exhaust side removing it of adhesive ( part of power... A 3.0-liter inline 6-cylinder engine ( continued ) 1 servicing the electronic control unit ( )... Support bearing bracket so it lightly makes contact with oil, water pump pulley fan... 2 omega at each terminal and body when the coolant system, radiator breather hose, reservoir tank and. Holes of a suitable engine hoist to the lack of information available at the center support-to-chassis...